A grognard exercise, not a scientific model. What that means

Sites / Potash / T1-07

Esterhazy

ProducingSaskatchewanPotash list, T1-07
Esterhazy from above, 5 km across
5 km across
Esterhazy from above, 15 km across
15 km across

Sentinel-2, 27 September 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use.

What it is

OperatorMosaic
OwnerThe Mosaic Company, 100%
Province or stateSaskatchewan
DistrictSouth-east Saskatchewan
WhereEsterhazy
Location50.65° N, 101.99° W, to about a kilometre. How it was placed: from a filed document or a government survey point (grade A)
How it is minedconventional underground
First productionK3 completed in 2022; K1 and K2 are decades older
StatusProducing from K3. The K1 and K2 shafts were closed in 2021 and 2022.
TenureKL 105, KL 126, KLSA 003
Also known asEsterhazy K3
See alsoEsterhazy K1, Esterhazy K2, Esterhazy K4 resource area

Numbers

Capacity

MeasureMt a year
Nameplate or proven peaking6.3
Operational, 20246.3
Operational, 20256.3

Production

YearMt
20244.7
20254.7

Reserves

Reserves478 Mt of ore
Grade20.8% K2O
Remaining lifeK3 to 2049; K4 resources scheduled 2045 to 2078

What is where

WhatPositionSource
Site point for K3 given in Mosaic's 10-K50.6462° N, 101.993° WMosaic Form 10-K for FY2024 and FY2025, with the S-K 1300 technical report summaries (SEC EDGAR)

Published positions, given as their source gives them. The game does not use them: it works on district totals.

Notes

  • Mosaic reports 6.3 Mt as both proven peaking capacity and operational capacity. A third-party audit put nameplate at 7.8 Mt; Mosaic says it has been unable to rely on that audit to raise its Canpotex share.
  • It produced 4.7 Mt in both 2024 and 2025, against 6.3 Mt of operational capacity.
  • Management guidance on the Q3 2026 call: on pace for more than 5 million tons going into 2027.

In the game

It counts toward the potash total of South-east Saskatchewan: 6.3 of 10.8 Mt of operating capability there, and 22.8% of Canada's. The game does not yet treat districts separately: all Canadian potash is still one flow out of Saskatchewan.

This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.

Sources

  • Mosaic Form 10-K for FY2024 and FY2025, with the S-K 1300 technical report summaries (SEC EDGAR), as cited in the inventory
  • Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery

Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise. Record in data/sites/potash.yaml, added in 0.1.3.9.