A grognard exercise, not a scientific model. What that means

Sites / Potash / T1-08

Belle Plaine

ProducingSaskatchewanPotash list, T1-08
Belle Plaine from above, 5 km across
5 km across
Belle Plaine from above, 15 km across
15 km across

Sentinel-2, 6 November 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use.

What it is

OperatorMosaic
OwnerThe Mosaic Company, 100%
Province or stateSaskatchewan
DistrictRegina and Moose Jaw district
WhereBelle Plaine, west of Regina
Location50.43° N, 105.20° W, to about a kilometre. How it was placed: from a filed document or a government survey point (grade A). The coordinates are printed garbled in Mosaic's FY2025 10-K. The reading used lands on the plant in Roger Wilco Imagery's baseline.
How it is minedsolution mining
StatusProducing
TenureKL 106-R

Numbers

Capacity

MeasureMt a year
Nameplate or proven peaking3.9
Operational, 20243
Operational, 20253

Production

YearMt
20243
20253

Reserves

Reserves639 Mt of ore
Grade19.3 (2024 table)% K2O

What is where

WhatPositionSource
Site point given in Mosaic's 10-K, reconstructed from a garbled print50.4277° N, 105.198° WMosaic Form 10-K for FY2024 and FY2025, with the S-K 1300 technical report summaries (SEC EDGAR)

Published positions, given as their source gives them. The game does not use them: it works on district totals.

In the game

It counts toward the potash total of Regina and Moose Jaw district: 3 of 5 Mt of operating capability there, and 10.9% of Canada's. The game does not yet treat districts separately: all Canadian potash is still one flow out of Saskatchewan.

This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.

Sources

  • Mosaic Form 10-K for FY2024 and FY2025, with the S-K 1300 technical report summaries (SEC EDGAR), as cited in the inventory
  • Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery

Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise. Record in data/sites/potash.yaml, added in 0.1.3.9.