A grognard exercise, not a scientific model. What that means

Sites / Potash / T3-01

Jansen Stage 1

Under construction or advancedSaskatchewanPotash list, T3-01
Jansen Stage 1 from above, 5 km across
5 km across
Jansen Stage 1 from above, 15 km across
15 km across

Sentinel-2, 28 September 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use.

What it is

OperatorBHP
OwnerBHP Group, 100%, through BHP Canada
Province or stateSaskatchewan
DistrictEast-central Saskatchewan
Whereabout 140 km east of Saskatoon
Location51.90° N, 104.71° W, to about a kilometre. How it was placed: from a filed document or a government survey point (grade A)
How it is minedconventional underground
First productionTargeted for the middle of 2027
StatusUnder construction: 84% complete in BHP's FY26 annual report
TenurePotash lease special agreement KLSA 011, signed 23 November 2012, 21-year term
See alsoJansen Stage 2, Jansen expansion lands

Numbers

Capacity

MeasureMt a year
Design4.15

Reserves

Reserves1,070 Mt of ore
Grade24.9% K2O
Remaining lifealmost 60 for Stages 1 and 2 together (BHP)

What is where

WhatPositionSource
Service shaft collar51.8991° N, 104.715° WBHP Form 20-F for FY26, 6-K filings and the S-K 1300 Jansen technical report summary (SEC EDGAR)

Published positions, given as their source gives them. The game does not use them: it works on district totals.

Notes

  • The only large new potash mine actually being built in Canada.
  • Cost: US$8.4 billion including contingency, up from about US$5.7 billion at approval in August 2021.
  • BHP took a US$2.3 billion impairment on Jansen in FY26.
  • Its product is contracted to ship through Westshore Terminals to 2051.

In the game

Not counted yet. It adds to its district's total only once it produces.

This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.

Sources

  • BHP Form 20-F for FY26, 6-K filings and the S-K 1300 Jansen technical report summary (SEC EDGAR), as cited in the inventory
  • Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery

Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise. Record in data/sites/potash.yaml, added in 0.1.3.9.