Sites / Potash / T4-04

Wynyard

Approved, not builtSaskatchewanPotash list, T4-04
Wynyard from above, 5 km across
5 km across
Wynyard from above, 15 km across
15 km across

Sentinel-2, 25 September 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use.

What it is

OperatorKarnalyte Resources
OwnerKarnalyte Resources (TSX: KRN)
Foreign state linkIts largest shareholder is Gujarat State Fertilizers and Chemicals, an Indian state-backed company, which invested in 2013 and has contracted to buy 350,000 tonnes a year from the first phase.
Province or stateSaskatchewan
DistrictEast-central Saskatchewan
WhereWynyard, about 175 km east of Saskatoon
Location51.70° N, 104.02° W, to about a kilometre. How it was placed: from a filed document or a government survey point (grade A). Not built. The point is the province's survey point for the permit area.
How it is minedsolution mining
StatusUnfinanced. The company calls it construction ready.

Numbers

Capacity

MeasureMt a year
Phase 10.675
All phases2.17

Reserves

Reserves777.1 Mt of ore
Grade12.4% K2O
Remaining life70 years

What is where

WhatPositionSource
Provincial survey point for the permit area (SMDI 2882)51.704° N, 104.017° WSaskatchewan Mineral Deposit Index (Saskatchewan Geological Survey)

Published positions, given as their source gives them. The game does not use them: it works on district totals.

Notes

  • A feasibility study was filed on 7 January 2026.

In the game

Not counted. It is recorded so the picture of who holds what is complete.

This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.

Sources

  • Karnalyte Resources feasibility study filed on SEDAR+ (7 January 2026) and Mining Weekly, as cited in the inventory
  • Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery

Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise. Record in data/sites/potash.yaml, added in 0.1.3.9.